loong64 build of dleyna-connector-dbus 0.2.0-ok1 in openkylin nile RELEASE
created
Build status
Successfully built
on loong64-124-8222
- Started
- Finished (took 2 minutes, 2.4 seconds)
- buildlog (24.4 KiB)
- dleyna-connector-dbus_0.2.0-ok1_loong64.changes (1.6 KiB)
Build details
Binary packages
Binary packages produced by this build:
- libdleyna-connector-dbus-1.0-1-0.2.0-ok1
- libdleyna-connector-dbus-1.0-dbg-0.2.0-ok1
Built files
Files resulting from this build: